ArcGIS REST Services Directory Login | Get Token
JSON

Layer: AFIF CALL-II 1 (ID: 12)

Sub Layers: Name: AFIF CALL-II 1

Display Field:

Type: Group Layer

Geometry Type: null

Description: <DIV STYLE="text-align:Left;font-size:12pt"><DIV><DIV><P STYLE="font-style:italic;font-weight:bold;margin:0 0 0 0;"><SPAN>The Alternative Fuels Infrastructure Facility (AFIF) layer is based on a gap analysis of recharging stations on the TEN-T network, which also include the previously selected AFIF projects. Gaps in the TEN-T network coverage of recharging stations are deemed to subsist where a maximum 60 km distance in-between recharging points with the following characteristics is exceeded: Map 1: publicly accessible recharging points, equipped with a CCS connector, with a minimum power output of 150kW and below</SPAN><SPAN> </SPAN><SPAN>350kW.</SPAN><SPAN> </SPAN><SPAN> Map 2: publicly accessible recharging points, equipped with a CCS connector, with a minimum power output of 350kW.</SPAN></P><P STYLE="font-style:italic;font-weight:bold;margin:0 0 0 0;"><SPAN><SPAN>Those sections of the TEN-T network are coloured in red on the map and investments in recharging points on those sections are therefore potentially eligible for support under AFIF. </SPAN></SPAN></P><P STYLE="font-style:italic;font-weight:bold;margin:0 0 0 0;"><SPAN><SPAN>For the avoidance of doubt: investments in recharging points on sections coloured in green are not eligible. </SPAN></SPAN></P><P STYLE="font-style:italic;font-weight:bold;margin:0 0 0 0;"><SPAN><SPAN>Data source: European Alternative Fuels Observatory (</SPAN></SPAN><A href="http://www.eafo.eu/" STYLE="text-decoration:underline;"><SPAN STYLE="text-decoration:underline;"><SPAN>www.eafo.eu</SPAN></SPAN></A><SPAN>); Covering the Cut-off date: 24/09/2024.</SPAN></P><P STYLE="font-style:italic;font-weight:bold;margin:0 0 0 0;"><SPAN /></P><P STYLE="font-style:italic;margin:0 0 0 0;"><SPAN STYLE="font-weight:bold;"><SPAN>Disclaimer: </SPAN></SPAN><SPAN>Please note that the maps are based on the best available data, but that fully accurate and comprehensive coverage of the currently existing recharging infrastructure cannot be guaranteed. At this stage the maps do not take into account the directions of traffic per section and will be updated for second and third cut-off respectively. These updates may also reflect the application of Regulation (EU) 2023/1804 of the European Parliament and of the Council of 13 September 2023 on the deployment of alternative fuels infrastructure and repealing Directive 2014/94/EU, which is foreseen as from 13 April 2024.</SPAN></P></DIV></DIV></DIV>

Copyright Text:

Default Visibility: false

MaxRecordCount: 0

Supported Query Formats: JSON, geoJSON, PBF

Min Scale: 0.0

Max Scale: 0.0

Supports Advanced Queries: false

Supports Statistics: false

Has Labels: false

Can Modify Layer: false

Can Scale Symbols: false

Use Standardized Queries: true

Supports Datum Transformation: true

Extent:
Drawing Info: Advanced Query Capabilities:
HasZ: false

HasM: false

Has Attachments: false

HTML Popup Type: esriServerHTMLPopupTypeNone

Type ID Field: null

Fields: None


Supported Operations:   Query   Query Attachments   Query Analytic   Generate Renderer   Return Updates

  Iteminfo   Thumbnail   Metadata