x
Copied to clipboard!

Demonstration installation for thermal utilization of sewage sludge by pyrolysis

Reference: LIFE11 ENV/PL/000453 | Acronym: Spalarnia pirolityczna OS

PROJECT DESCRIPTION

BACKGROUND

Today, one of the main challenges of waste management is the treatment of municipal sewage sludge. In Poland some 527 000 tonnes of this waste were produced in 2010 and forecasts predict that volumes of sewage sludge will continue to increase. Many new wastewater treatment plants are being built or modernised across Poland and, as a result of this extensive investment programme, large amounts of sewage sludge will be produced that will need to be properly disposed of. Landfill sites (the main method of waste disposal today) will be limited by EU restrictions on the landfilling of biodegradable waste. This has increased interest and demand for thermal disposal methods. Poland’s national waste management plan in 2010 promoted greater uptake of thermal treatments for municipal sewage sludge and noted that in 2010 only 3.75% of this waste was treated by thermal methods. Technology developed by the beneficiary offers opportunities to treat more of Poland’s sewage waste using pyrolysis and the technology may be particularly relevant for small towns and villages.


OBJECTIVES

The main objective of the 'Spalarnia pirolityczna OS' project is to verify and to promote an innovative technology for treating sewage sludge using a thermal pyrolysis boiler. Findings from previous laboratory-scale tests that combined waste silica with sewage sludge will be up-scaled and applied to demonstrate the potential of a more ‘market-ready’ boiler installation. Operations will be monitored to confirm heat conversion data and performance of the boiler against various input and output parameters. Emissions will be carefully monitored and controlled. Knowledge produced by the demonstration phases will be used in a comprehensive publicity campaign to raise awareness about the technology’s environmental and socio-economic benefits. The campaign will target companies operating in associated sectors as well as potential investors and the general public.

Expected results: The main anticipated project result is the demonstration of an innovative technology for hazard-free treatment of sewage sludge using waste silica in a thermal pyrolysis boiler.

Other expected results include:

  • Evaluation and optimisation of performance parameters for the technological process;
  • An analytical report about the technology’s potential environmental impacts;
  • An analytical report comparing the technology’s energy inputs and outputs;
  • An analytical report about the technology’s economic viability; and
  • 10 information meetings and 10 demonstration events explaining the performance of the project's technology.

  • ADMINISTRATIVE DATA


    Reference: LIFE11 ENV/PL/000453
    Acronym: Spalarnia pirolityczna OS
    Start Date: 01/06/2012
    End Date: 31/12/2015
    Total Eligible Budget: 2,357,810 €
    EU Contribution: 1,178,905 €
    Project Location: Jesiona

    CONTACT DETAILS


    Coordinating Beneficiary: FU-WI Spółka z ograniczoną odpowiedzialnością
    Legal Status: PCO
    Address: Grochowska 5B, 82-300, Elbląg,


    LIFE Project Map

    ENVIRONMENTAL ISSUES ADDRESSED

    THEMES

    • Waste water treatment

    KEYWORDS

    • waste water treatment
    • sewage sludge

    TARGET EU LEGISLATION

    • Directive 91/271 - Urban waste water treatment (21.05.1991)

    PARTNERSHIPS

    Name Type
    FU-WI Spółka z ograniczoną odpowiedzialnością Coordinator
    None Participant

    READ MORE