x
Copied to clipboard!

Per and PolyFluorinated Alkyl Substances in grOUNdwaTer: water treatment for industrial use in the surfAce fInishing iNdustry

Reference: LIFE21-ENV-IT-LIFE-FOUNTAIN/101074321 | Acronym: LIFE21-ENV-IT-LIFE FOUNTAIN

PROJECT DESCRIPTION

BACKGROUND

The LIFE FOUNTAIN project proposes a remediation solution for the reduction of groundwater and aquifer PFAS (PFOS, PFOA, GenX, PFBS, etc.) pollution by utilizing an innovative technology based on functionalized magnetic nanoparticles that will allow the use of treated groundwater in the surface finishing industry and the downstream treatment of wastewater, restoring aquifer resources and reducing water consumption. In this context, LIFE FOUNTAIN solution consists of the following three pillars: i) novel sampling and analytical methodologies for PFAS monitoring; ii) remediation approach based on functionalized magnetic nanoparticles and advanced electrochemical oxidation iii) treatment of wastewater deriving from the surface finishing industry for PFAS removal and utilization of treated groundwater for the needs of the surface finishing industry. Their integrated use will increase understanding of PFAS effects on the environment by improving analytical methods, screening and testing protocols/strategies, and sustainable treatment technologies. This LIFE FOUNTAIN conceptual scheme is designed with the objective of obtaining specific solutions, technically and economically viable, socially acceptable, environmentally positive, and business opportunities, to push partners, as well as the industrial growing sectors, to a better competitive situation. The primary output of the LIFE FOUNTAIN project is the demonstration in relevant environment (TRL-6) of an innovative, environmentally sustainable and cost-effective remediation solution for the removal of PFAS from groundwater and wastewater. The consortium is specifically designed to enable rapid uptake through the combination of industrial partners with the capacity to develop the required technologies and roll out the remediation solution across their locations, together with academic and association beneficiaries who will be able to respond quickly to the distinct and diverse requirements of the end-users.


ADMINISTRATIVE DATA


Reference: LIFE21-ENV-IT-LIFE-FOUNTAIN/101074321
Acronym: LIFE21-ENV-IT-LIFE FOUNTAIN
Start Date: 01/08/2022
End Date: 31/01/2027
Total Eligible Budget: 2,172,635 €
EU Contribution: 1,303,581 €

CONTACT DETAILS


Coordinating Beneficiary: GASER T.C.-TECHNICAL COATING-S.R.L.
Legal Status: PRIVATE
Address: VIA ENZO FERRARI N. 51, 36033, Isola Vicentina,
Contact Person: Enrico GALLIANI
Email: Send Email
Website: Visit Website


PARTNERSHIPS

Name Type
GASER T.C.-TECHNICAL COATING-S.R.L. Coordinator
P D SERVICE SRL Participant
CAPTIVE SYSTEMS SRL Participant
POLITECNICO DI MILANO Participant
ASFIMET SRL Participant
EREDI DI BONACINA MARIO SRL Participant