PROJECT DESCRIPTION
BACKGROUND
Water reuse in semi-arid regions has been demonstrated as the most sustainable alternative to the use of desalinated seawater and imported water in terms of both cost and environmental impact. Nevertheless, water reuse is only practised in a limited number of areas across the EU, with the main barriers identified as public perception, the cost of water reuse systems, and the lack of reclaimed water tariffs to ensure cost recovery or provide incentives for water reuse. The European Commission established a regulatory framework through the EU Water Reuse Regulation, laying down minimum requirements applicable to reclaimed water intended for agricultural irrigation.
Murcia is characterised as one of the most water stressed regions of Spain, and indeed Europe. More than 80% of the volume of treated municipal wastewater, following filtration and/or chlorine disinfection, is reused for agriculture in accordance with the Spanish Royal Decree 1620/2007 for water re-use. However, in order to meet the higher quality requirements established under EU Water Reuse Regulation (transposed to the Spanish regulations through the Royal Decree 1085/2024), water reclamation schemes need to be made more robust, together with the corresponding risk assessment methodologies, thereby ensuring the removal of particulate organic matter and the relevant microbiological pollutants.
OBJECTIVES
The LIFE WARRIOR project aimed to demonstrate an innovative and cost-effective water reclamation system capable of ensuring the safe reuse of reclaimed water for crop irrigation, in line with the EU Water Reuse Regulation on minimum requirements for water reuse.
The WARRIOR reclamation train is based on the application of reused worn-out ultrafiltration (Re-UF) membranes and a low energy, chemical-free disinfection process using UV lamps with light emitting diodes (UV-LED). The project would couple this system with a WARRIOR Digital Tool for risk management and process optimisation, to estimate and extend membrane lifespan. The project also aimed to develop the Re-UF Market Place Service as a digital platform designed to connect providers of used membranes (such as water utilities or administrations operating drinking water treatment plants) with end-users. This treatment train would be demonstrated in Murcia.
RESULTS
The main project objectives were satisfactorily achieved. Although the project reported a lower than expected volume of wastewater treated (80 059 m³/year actually treated versus the expected 200 750 m³/year), the feasibility of the innovative system to produce reclaimed water in compliance with Class A, in accordance with the EU Water Reuse Regulation (and Class A.A, as established in the Spanish Royal Decree 1085/2024) was demonstrated.
The system, based on reused ultrafiltration membranes and a UV-LED disinfection system was complemented by a digital tool including a Decision Support System (DSS) and a sensor and alarm-based monitoring system, aimed at extending the UF membrane lifespan and supporting risk management through digitalised Sanitary Safety Plans. The water produced was used by 2 concessionaires, for agriculture and a golf course. The system also implies the valorisation of worn-out UF membranes, which were used for more demanding uses (i.e. drinking water treatment plants).
Both the Life Cycle Analysis (LCA) and Life Cycle Costing (LCC) showed favourable results for the project solution, compared to the conventional treatment train (i.e. new UF membranes and mercury-based UV disinfection). The reduction in unit treatment costs is particularly significant, reaching approximately 60% (0.17 €/m³ for the conventional solution versus 0.07 €/m³ for the WARRIOR treatment train).
The continuation of the pilot plant at the project site is ensured, with the system treating 100% of the secondary effluent from the Nueva Sucina water reclamation plant (WRP), estimated at 146 540 m³/year (475 m³/day).
A feasibility study was also carried out to assess the replication of the project solution at 6 locations, as well as its transfer to another 2 wastewater treatment plants (WWTP) for more demanding applications, including aquifer recharge, industrial cooling and non-potable urban uses. As a result, a realistic replication plan was developed, including the installation of the project solution at 2 additional sites: Nueva Corvera WWTP (189 800 m³/year, 520 m3/day) and Baños y Mendigo WWTP (173 375 m³/year, 475 m3/day).
The business model includes 10-year financial projections. The analysis indicates that the project solution reaches operational break-even in the fifth year, with a payback period of 7–8 years. It also projects a positive Internal Rate of Return (IRR) of 8.6% and a Net Present Value (NPV) of €4 790, while delivering 67.3% savings compared to the purchase of new membranes. The main bottleneck identified is the availability of used UF membrane cassettes from water treatment plants.