PROJECT DESCRIPTION
BACKGROUND
Lombardy is a region rich in biodiversity, containing 241 Natura 2000 sites, covering 15% of its total area. It is also the most populous region in Italy, containing one-sixth of the country’s population (about 10 million people) and producing one fifth of its GDP. Reconciling agricultural and industrial production needs with biodiversity and conservation represents a major challenge for the region. The economic crisis presents a further challenge: public funds are getting scarcer and to ensure the long term management and restoration of the regions Natura 2000 network, a long term, integrated approach is required.
OBJECTIVES
The aim of this project is to prepare, on the basis of the approach of the Priority Action Frameworks (PAFs), concrete and operational measures for the Natura 2000 network.
The project’s overall objective is to develop a regional management programme and a ‘prioritised action framework’ for the 241 Natura 2000 sites in Lombardy.
Specific objectives include:
Expected results:
RESULTS
The project GESTIRE, managed by the Environment, Energy and Sustainable Development Directorate General of the Lombardy Region, promoted the development of an integrated and participated regional strategy for the management of the entire Natura 2000 network of Lombardy, contributing to the restoration and maintenance in a satisfactory state of sites, habitats and species, in line with the EU Biodiversity Strategy to 2020. The main product of the project was the Prioritised Actions Framework (PAF), which contains: an overview introducing N2K and the status of habitats and species; legal and administrative arrangements for the protection and management of N2K; the current estimate of funding requirements for the management of the network; N2K strategic conservation objectives and priorities for the 2014-2020 period; the description of the key measures to achieve them. This strategy is being implemented thanks to the funds of the IP GESTIRE 2020 project and complementary funds such as RDP, POR_FESR, Regional funds on Green areas. During the 41 months of the project duration, all planned activities were carried out and all expected results achieved. The main successes were: · The establishment and operation of a "Nature Group 2000" composed by delegates of each Regional department having competence on the territory; · An analysis of documents for the management of Natura 2000 sites in Lombardy, supported by a on-line database for storing structured data of the management plan and the conservation measures for the Lombardy Natura 2000 sites and a document archive (MediaWiki) to consult online the collected material. · An estimation of the socio-economic value of the Natura 2000 network in Lombardy · The analysis of the existing regulatory measures and their potential updating that produced, at regional level, the issue of the Regional Law of March 30,2016, n. 8 "Regional European Act 2016. Provisions for the fulfilment of obligations of the Lombardy Region deriving from Italy's membership in the European Union" (BURL n. 13, suppl. of April 1, 2016) by inserting items which strictly discipline the procedural rules of the Appropriate Assessment. At national level this analysis has been diffused by the Ministry of the Environment among the components of the national working group on appropriate assessment as a reference document for the elaboration of the National Guidelines on Appropriate Assessment. · A study on jobs related to Natura 2000 that will allow the managing authorities of ESF funds to promote specific training courses for free-lance consultants and N2K managers. · The preparation of the Conservation measures for sites without a management plan and the identification of the measures for the connection of the Natura 2000 network sites to improve the regional ecological network · The production of the Single Planning Document containing more than 5000 site-specific measures and standards for the protection of the sites. This document was approved by the Regional Council Resolution no. 4429 of November 30, 2015. · The preparation of a financial plan for the management of the Natura 2000 network in Lombardy for the period 2014-2020 and the identification of possible funds. Additional products of this action are the elaboration of the Guide to Natura 2000 financing in Lombardy, the launch of the specific web site http://www.finanziamenti-naturachevale.it/il-portale/orientamento-ai-finanziamenti/ and the elaboration and implementation of a GIS database, which allows the overlap of data on Natura 2000 with the data of the Agricultural Information System of the Lombardy Region (SIARL) by province and on cadastral card. · The formulation of the scientific monitoring program The results produced also communication and information material: · guidelines for the conservation of biodiversity in the N2K by citizens and businesses, · a project website www.naturachevale.it , · 120,000 copies of the brochure on Natura 2000 and biodiversity and the concrete benefits of the Natura 2000 sites, · 132000 Z-Card (an average of 11 thousand for each province). It consists in a pocket book that when opened takes the dimensions of a map and contains a range of information designed to promote knowledge of and the visit to the Natura 2000 sites present in each province, · a radio and / or TV campaign on one or more radio / private broadcasters, · a banner campaign on websites and portals, · viral marketing activities (call action) and communication on social networks, · the production and dissemination of educational materials on the Natura 2000 network, · a photo contest, · a press conference, · press kits in Italian and English containing informative material and filmed and photographic documentation on the Natura 2000 network in Lombardy, · Information panels and roll up, · 12 press releases, · 38 articles / news, · a international conference held in Brussels on 23 June 2015, · a national conference held in Milan on 24 February 2016