PROJECT DESCRIPTION
BACKGROUND
A ship reaches the end of it working life after 20-30 years and is sold as scrap and dismantled to recover the steel. Almost 90% can be reused as high-quality steel. The problem is that the remaining 10% contains high quantities of dangerous waste. In the 1970s, ships were dismantled in European ports. It was a complex and mechanised industrial operation. Greater environmental regulation, and higher security and health standards, however, increased the costs and the industry moved its operations to cheaper countries, in particular those in Southeast Asia (Bangladesh, India and China), as well as Turkey. In contravention of the Basel Convention, which bans the export of dangerous waste to developing countries, ships are now being dismantled overseas. In these countries, workers often lack protection, and health and safety standards are poor. A great quantity of waste is dumped directly into the environment.
OBJECTIVES
The objectives of the RECYSHIP project were to:
RESULTS
The Recyship project fulfilled all its objectives, making a thorough analysis of existing normal practices and taking active part in the drawing up of the EU regulation on ship recycling. The project team made some recommendations during the public information process and developed an interesting analysis of the state-of-the-art techniques used in ship dismantling. The Portuguese partner, Navalria (a dangerous waste management company, in charge of the dismantling tests) was the first company to obtain a permit for ship dismantling in Portugal and Spain. Thanks to the experience gained with the dismantling tests, the project was also able to develop an Integrated Management System operating on very detailed procedures that covers the whole dismantling process – from the purchase, transport and waste management.
The system developed by the project minimises potential environmental impacts and health and safety risks, and also optimises steel recycling. The environmental benefits are:
A total of three prototypes were developed and tested: an automated steel cutting machine, a TBT scraping machine and a bilge water treatment plant. Three ships were dismantled in total, while retired submarine from the Spanish Navy was purchased and decontaminated. Moreover, a spin-off company was set up to carry out ship recycling activities. It was funded by the beneficiary just after the end of the project. Reciclauto Reciclaje naval, S.L. will contribute to the development of a new economic activity at regional and national level. The beneficiary has estimated that in the long term, up to 400 jobs could be created in Spain, on the bases of 120 ships recycled every year.
The project was also very timely, finishing just a month ahead of the approval of an EU regulation on ship recycling. When the project started, the regulation was in its first phase of development, and the beneficiary had the opportunity to make a valuable contribution during the public information process. Many of the main recommendations of the project were included in the regulation, including: